Skip to main content
創見智能Transcend Intelligence

16Smart Energy

From seeing your power use to planning it with confidence

Based on your loads, usage patterns and site, we work with qualified partners to assess storage, solar and EV charging.

  • Storage and backup
  • EV charging integration
  • Energy planning
Wall-mounted BUIMA battery modules next to a DC fast charger

Your challenges, solved together

How we help

Three ways we make it work

  1. 1

    Storage and backup

    BUIMA B.E.S.T. tiles store 4 kWh each, up to 16 kWh with four, providing per-floor or parking-lot backup and everyday peak shaving.

  2. 2

    EV charging integration

    Single-phase 200–240 VAC input boosted to 400 VDC feeds a DC-DC fast charger, with optional solar for a solar-storage-charging setup.

  3. 3

    Energy planning

    We size systems to your loads and usage; grid-scale projects are assessed with BUIMA Group, and energy data can be compiled in MiEcoMatrix.

How rollout works

  1. 01AssessGather bills, load profiles, contracted capacity and site details.
  2. 02EvaluateAssess storage capacity, charging power and solar with qualified partners.
  3. 03InstallQualified contractors install, connect and test to code.
  4. 04OperateMonitor via EMS and schedule maintenance.

FAQ

Can we add DC fast charging without three-phase power?

It can be assessed. B.E.S.T. takes single-phase 200–240 VAC, stores it and boosts to 400 VDC for a DC-DC fast charger; feasibility and charging power depend on your site's supply.

Can it work with solar?

Yes. The Control Box accepts optional renewable DC input for a solar-storage-charging system; solar design and installation are assessed with qualified partners.

More in Energy & Sustainability

Tell us about your site. We'll plan the rest.

Our request form takes about a minute. We reply within 1 business day with recommendations for your site, scale and budget.

Request a consultationLINECall